Investigations in progress
Breaches alleged of Genesis Power Limited
Self-reported breach by Genesis concerning failure to comply with dispatch instructions for Tekapo hydro scheme on 15 November 2011.
Parties to investigation - the System Operator and Meridian Energy Limited.
Breaches alleged of the System Operator
Self-reported and alleged breaches by the System Operator. The self-reported breaches and alleged breaches concern the loss of power supply to Kinleith paper mill, Tokoroa and surrounding areas on 27 October 2010.
Parties to investigation - the System Operator, Carter Holt Harvey, Norske Skog Tasman and Powerco.
Breach alleged of the Grid Owner
Alleged breach by the Grid Owner for not ensuring at all the times that an AUFLS system is installed for the Tiwai Point GXP since 1 March 2004.
Parties to investigation - the Grid Owner, the System Operator, Meridian and Rio Tinto Alcan (NZ).
This page is related to: Code & Regulations.