Wairakei Ring economic investment - history

Final decision

No request for a public conference was received on the Wairakei Ring Investment Proposal; therefore the Commission’s decision to approve the Wairakei Ring Investment Proposal was final.

Background

Transpower analysed the scope for economic investment in the lower South Island (enabling renewable generation for the lower South Island) and the central North Island (enabling renewable generation in the Wairakei Ring) also known as the Transmission to Enable Renewable investments (TER).

The Commission and Transpower met to discuss how to approach the grid investment test for these projects. Following the meeting, the Commission’s Board was presented with a paper seeking the Board’s guidance as to how generation scenarios could be developed and the economic analysis undertaken. An interested party asked for this paper to be provided.

Following the January 2008 Board meeting, the Commission wrote to Transpower to provide high-level guidance on these projects.

Timetable and amendments

A timeline for development and consideration of these two projects was proposed by Transpower and agreed by the Commission in February 2008.

In April 2008, Transpower wrote to the Commission, providing an updated process and timeframe for consideration and approval of the TER proposals.

The Commission agreed to this revised timetable (“the May 2008 timetable”) which anticipated Transpower submitting the TER proposals on 28 October 2008 and the Commission releasing a notice of intention in December 2008.

In August 2008, Transpower wrote to the Commission advising that it was intending to proceed with the Wairakei Ring project, but wished to defer the Lower South Island project for further investigation. Transpower advised that it now expects to submit the Lower South Island project to the Commission in mid 2009.

Transpower further advised that it now intended to submit the Wairakei Ring project on 17 December 2008. Accordingly, a further revised timetable (“the September 2008 timetable”) was agreed to.

The September 2008 timetable lapsed as the Commission’s review of the investment required more work than was originally anticipated. Accordingly, on 28 January 2009, the Commission and Transpower agreed to an amended timetable (“January 2009 timetable”).

Transpower's application

On 17 December 2008, Transpower submitted to the Commission a new Grid Upgrade Plan (2008 GUP), under rule 12 of section III of part F of the Electricity Governance Rules 2003.

The 2008 GUP includes Transpower’s Wairakei Ring Investment Proposal to facilitate connection of renewable generation in the central North Island. Transpower’s proposal was to build a new double circuit 220kV line connecting directly from Wairakei to Whakamaru. This new line would approximately parallel the existing Wairakei-Whakamaru “B” line, which would be decommissioned and removed.

Transpower submitted the Wairakei Ring proposal as an economic investment and seeks approval of up to $141 million for the proposal. As an economic investment, Transpower had already consulted with the public on the proposal.

Notice of Intention

On 20 February 2009, the Commission published a notice of intention to approve the Wairakei Ring Investment Proposal.

Reasons for decision

The Reasons for Decision document presents the Commission’s analysis of the Wairakei Ring Investment Proposal and explains the reasons supporting the Commissions intention to approve the proposal.

Supporting analysis

The Commission was assisted in its decision making by further analysis undertaken by Transpower, its staff and external advisers.

Opportunity for comment

Under rule 15.2 of section III of part F of the Electricity Governance Rules 2003, a designated transmission customer, an authorised representative of parties substantially affected by the Grid Upgrade Plan, or Transpower, may, within 10 working days of the date of publication of the notice of intention (that is, by 5pm on 6 March 2009), request that the Commission hold a public conference if they consider that:

  • The interests of end use customers are materially adversely affected by the cost or the service outcome of the reliability investment to which the notice relates; or 
  • The Grid Investment Test has not been applied properly to the Grid Upgrade Plan

The purpose of a public conference is to provide a final opportunity for comment on the reliability investment to which the notice relates.

If no request to hold a public conference is received, or if the Electricity Commission determines not to hold a public conference, the Electricity Commission’s decision, as set out in this notice of intention, is final.

Related Documents

Commission's letter dated 8 February 2008 re high-level guidance

letter-8Feb08.PDF | PDF | 162 KB | Modified: 07/09/2010 11:39am

Transpower's letter dated 17 December 2008 re proposal

TP-ltr-17Dec08.pdf | pdf | 79 KB | Modified: 07/09/2010 11:39am

Proposal

Executive summary

Executive-summary.pdf | pdf | 221 KB | Modified: 07/09/2010 11:39am

Proposal

Part A - Proposal

PartA.pdf | pdf | 61 KB | Modified: 07/09/2010 11:39am

Proposal

Part B - Justification

PartB.pdf | pdf | 1.1 MB | Modified: 07/09/2010 11:39am

Proposal

Part B - Attachment A - GIT results

AttachmentA.pdf | pdf | 417 KB | Modified: 07/09/2010 11:39am

Proposal

Part B - Attachment B - Analysis assumptions and methodology

AttachmentB.pdf | pdf | 345 KB | Modified: 07/09/2010 11:39am

Proposal

Part B - Attachment C - Power Systems Analysis

AttachmentC.pdf | pdf | 907 KB | Modified: 07/09/2010 11:39am

Proposal

Part B - Attachment D - Cost Report

AttachmentD.pdf | pdf | 505 KB | Modified: 07/09/2010 11:39am

Proposal

Part B - Attachment E - Final Long-list and Short-list criteria

AttachmentE.pdf | pdf | 123 KB | Modified: 07/09/2010 11:39am

Proposal

Part B - Attachment F - Models and data

AttachmentF.pdf | pdf | 71 KB | Modified: 07/09/2010 11:39am

Proposal

Part B - Attachment G - Summary of Submissions from GIT consultation

AttachmentG.pdf | pdf | 93 KB | Modified: 07/09/2010 11:39am

Proposal

Timetable - February 2008 (original)

Timeline.pdf | pdf | 19 KB | Modified: 07/09/2010 11:39am

Transpower's 16 April 2008 letter re May timetable

letter-16Apr08.PDF | PDF | 362 KB | Modified: 07/09/2010 11:39am

Attachment A - Proposed consultation process and timeframe dated 19 May 2008 (revised)

Revised-Attachment-A.pdf | pdf | 14 KB | Modified: 07/09/2010 11:39am

Timetable - May 2008

May08-timetable.pdf | pdf | 20 KB | Modified: 07/09/2010 11:39am

Commission's letter dated 21 May 2008 re May timetable

letter-21May08.pdf | pdf | 225 KB | Modified: 07/09/2010 11:39am

Timetable - September 2008

| | 4 KB | Modified: 01/01/1970 12:00pm

Timetable - January 2009 (current)

timeline-Jan09.pdf | pdf | 19 KB | Modified: 07/09/2010 11:39am

Notice of Intention - 20 February 2009

NOI.pdf | pdf | 91 KB | Modified: 07/09/2010 11:39am

Reasons for Decision - 20 February 2009

reasons-for-decision.pdf | pdf | 347 KB | Modified: 07/09/2010 11:39am

Technical review of Wairakei Ring Upgrade Investment Proposal

technical-review.pdf | pdf | 1.3 MB | Modified: 07/09/2010 11:39am

Attachment to Reasons for Decision

Transmission Line Cost Review Wairakei Ring Upgrade Plan

ConnellWagner-report.pdf | pdf | 120 KB | Modified: 07/09/2010 11:39am

Supporting Analysis - external Advice from Connell Wagner

16 January 2009 - letter from Transpower to the Commission

16Jan09-ltr-TP-EC.pdf | pdf | 1.3 MB | Modified: 07/09/2010 11:39am

Supporting analysis - key correspondence

22 January 2009 - sensitivity analysis on constraint equations

22Jan09-sensitivity-analysis.pdf | pdf | 39 KB | Modified: 07/09/2010 11:39am

Supporting analysis - key correspondence

26 January 2009 - further analysis on geothermal costs

26Jan09-further-analysis.pdf | pdf | 32 KB | Modified: 07/09/2010 11:39am

Supporting analysis - key correspondence

29 January 2009 - costs of reconductoring options

RE-Wairakei-Ring.pdf | pdf | 54 KB | Modified: 07/09/2010 11:39am

Supporting analysis - key correspondence

10 February 2009 - associated costs of a double circuit line into Ohakuri

10Feb09-associated-costs-2.pdf | pdf | 714 KB | Modified: 07/09/2010 11:39am

Supporting analysis - key correspondence

Attachment to 10 February 2009 email - Wairakei Ring additional Information

FW-Wairakei-Ring-additional-Information.pdf | pdf | 4 MB | Modified: 07/09/2010 11:39am

Supporting analysis - key correspondence

This page is related to: Transmission.