Supporting documents for the 2008 SOO - archive
A number of other publications and information sources provided additional background material that may be of interest to readers of this document. Four reports in particular, produced in relation to the Commission’s ‘Transmission to enable renewables’ (TTER) project, were used as key input to the generation scenario analysis work undertaken for the 2008 SOO.
- Parsons Brinckerhoff Associates—‘Transmission to enable renewables—Potential NZ hydro schemes – December 2007— Final report’ (and Parsons Brinckerhoff Associates— ‘Transmission to enable renewables—Potential NZ hydro schemes – Final report (revised), June 2008).
- The Commission final report—‘Transmission to enable renewables—Existing and potential geothermal generation in New Zealand—March 2008’.
- Connell Wagner—‘Transmission to enable renewables—Economic wind resource study’.
- System Studies Group (SSG)—‘Transmission to enable renewables project, Transmission Network Reinforcement: Inputs for Generation Expansion Model (GEM) – April 2008’. This report was a key input to the generation scenario analysis work undertaken for this 2008 SOO.
Other information sources potentially of interest:
- The Commission’s consultation papers and explanatory documents prepared as part of the process to develop the draft 2008 GPA
- SSG report - 'Inter- Area Transmission Capacity - September 2006'
- MED’s Energy Data File
- The GUIRP
- Information on the methodology and data used to prepare the demand forecasts
Related Documents
GEM input data medium load
GEM-input-data-medium-load.xls | xls | 5.4 MB | Modified: 07/09/2010 9:26am
System Studies Group report: Power Systems Analysis for the 2008 Statement of Opportunities
SSG-report.pdf | pdf | 2.5 MB | Modified: 07/09/2010 9:26am
2007RootCase rawfiles andSLDs
2007RootCase-rawfiles-andSLDs.zip | zip | 472 KB | Modified: 07/09/2010 9:26am
This page is related to: Transmission.




