Transpower's notice of grid reconfiguration
Roskill
On 20 March 2009, Transpower advised the Commission that it would change the configuration of the grid in the Auckland region by closing the 110kV ‘split’ between Mt Roskill and Hepburn Road substations with effect from 23 March 2009 (or thereabouts).
A copy of the letter dated 20 March 2009 and details of Transpower’s analysis are available below.
Studholme
On 26 November 2009, Transpower advised the Commission that it would change the configuration of the grid in the South Canterbury region by periodically closing the 110kV ‘split’ between Studholme and Timaru substations with effect from December 2009 (or thereabouts).
The Electricity Commission analysed the data provided by Transpower and agreed that it resulted in a net benefit as calculated according to the Rules.
A copy of the letter dated 26 November 2009 and details of Transpower’s analysis are available below.
Related Documents
Letter from Transpower: Studholme reconfiguration, 20 March 2009
TP-ltr-20Mar09.pdf | pdf | 329 KB | Modified: 31/10/2010 5:29pm
Letter from Transpower: Roskill reconfiguration, 26 November 2009
TP-ltr-26Nov09.pdf | pdf | 1.2 MB | Modified: 31/10/2010 5:29pm