Market: retail consultations
Loss Factor Methodologies
19/02/2013 — 16/04/2013 5:00pm
Loss factors are determined by distributors so that the reconciliation process can account for the existence of technical losses (arising from inevitable physical loss of electricity in networks) and non-technical losses (arising from theft, metering errors and data handling errors). Read more »
Electricity Information Exchange Protocols (EIEPs) – Decisions and further consultation
05/02/2013 — 22/03/2013 5:00pm
The purpose of this paper is to notify participants of the Authority’s decision to confirm a number of revisions to terminology, definitions and field attributes used in the EIEPs. Read more »
Operational review of Part 6
04/09/2012 — 30/10/2012 5:00pm
Part 6 of the Code deals with the connection of distributed generation (DG) to distribution networks. Read more »
Model use-of-system agreements: proposed changes
02/07/2012 — 31/07/2012 5:00pm
The Electricity Authority (Authority) is working towards finalising model use-of-system agreements for conveyance and interposed distribution arrangements and for embedded networks. Read more »
Part 10 Implementation: Four proposed operational changes to the registry
22/06/2012 — 11/07/2012 5:00pm
The Authority has approved a new Part 10 and associated amendments to Parts 1, 11 and 15 to develop a new set of metering arrangements that will be effective from 6 June 2013.The new Part 10 requires significant changes to the registry. Read more »
Part 10 Implementation: Proposed changes to the registry ICP switching process
14/05/2012 — 31/05/2012 5:00pm
NOTE: On 16 May 2012 the Authority amended Appendix B of the consultation paper. Read more »
Mandatory population of new fields in the registry
17/04/2012 — 15/05/2012 5:00pm
This consultation paper seeks feedback from registry users likely to be affected by proposals to require distributors to populate and maintain some new registry fields. Read more »
Voluntary consultation guidelines for proposed changes to distributors' tariff structures
11/04/2012 — 09/05/2012 5:00pm
Clause 12A.7 of Part 12A of the Electricity Industry Participation Code 2010 (Code) requires distributors to consult with traders (retailers) on material changes to their tariff structures. Read more »
Miscellaneous Code Amendments
13/03/2012 — 13/04/2012 5:00pm
The Authority is proposing 4 substantive amendments to the Electricity Industry Participation Code 2010 (Code) in order to clarify certain obligations. Read more »
Model use-of-system agreements
15/02/2012 — 11/04/2012 4:00pm
The Electricity Authority (Authority) is working towards finalising model use-of-system agreements for conveyance and interposed distribution arrangements and for embedded networks. Read more »




