Transmission & distribution consultations

Decision-making and economic framework for distribution pricing methodology review

08/05/2012 — 22/06/2012 5:00pm

NOTE: Cross-submissions deadline: 9 July 2012 5:00pm Read more »

Decision-making and economic framework for transmission pricing methodology review

26/01/2012 — 24/02/2012 5:00pm

The Electricity Authority has released a consultation paper to obtain feedback on its proposed decision-making and economic framework for the Transmission Pricing Methodology (TPM) Review.The Authority's intention is to establish a comprehensive and durable framework for making decisions about allocating the costs of transmission services that are consistent with its objective to promote competition in, reliable supply by, and the efficient operation of, the electricity industry for the long-term benefit of consumers. Read more »

Transmission Pricing Review: Stage 2 Options

27/08/2010 — 24/09/2010 5:00pm

The Commission is undertaking a review of transmission pricing. Read more »

Interconnection Asset Capacity and Grid Configuration

22/02/2010 — 15/03/2010 5:00pm

Following review of Transpower's 2009 report on Interconnection Asset Capacity and Grid Configuration, the Commission proposes that, subject to consultation with materially affected parties, to amend schedule F6 of the Interconnection Rules by updating the schedule to include the information in the 2009 annual report. Read more »

Draft final Distribution Pricing Principles and Information Disclosure Guidelines

01/12/2009 — 22/12/2009 5:00pm

The Commission is inviting submissions on its paper on Distribution Pricing Principles and Information Disclosure Guidelines paper. Read more »

Transmission pricing review: high-level options

09/10/2009 — 07/12/2009 5:00pm

This consultation was undertaken by the Electricity Commission prior to 30 September 2010. Read more »

Proposed availability and reliability index measures - interconnection asset services

25/09/2009 — 16/10/2009 5:00pm

The Commission invites submissions on the consultation paper “Proposed availability and reliability index measures - interconnection asset services". Read more »

Model approach to distribution pricing

05/06/2009 — 10/07/2009 5:00pm

The Commission is inviting submissions on its paper on a draft proposed model approach to distribution pricing. Read more »

Draft report on transmission to enable renewables

07/04/2008 — 09/05/2008 5:00pm

The Commission invites submissions on the draft report on transmission to enable renewables. Read more »

Transmission to enable renewables

05/12/2007 — 01/02/2008 5:00pm

The Commission invites comments on the draft reports on hydro, wind and geothermal generation prepared by Consultants and the Commission. Read more »