Interconnection Asset Capacity and Grid Configuration
About this Consultation
Following review of Transpower's 2009 report on Interconnection Asset Capacity and Grid Configuration, the Commission proposes that, subject to consultation with materially affected parties, to amend schedule F6 of the Interconnection Rules by updating the schedule to include the information in the 2009 annual report.
Consultation Papers
Interconnection Asset Capacity and Grid Configuration
intercon-asset-gridconfig.pdf | pdf | 70 KB | Last Changed: 19/10/2010 4:18pm




