Undesirable Trading Situation Consultations

Proposed actions regarding 26 March 2011 UTS

15/06/2011 — 21/06/2011 5:00pm

Under Part 5 of the Electricity Industry Participation Code (the Code), the Authority is responsible for investigating any suspected or anticipated undesirable trading situations (UTS).  If the Authority finds that a UTS is developing or has developed, it may take steps in regard to that UTS.The Authority has reached a final decision that the situation existing on 26 March 2011 constitutes a UTS. Read more »

Draft decision regarding alleged UTS on 26 March 2011

06/05/2011 — 13/05/2011 3:00pm

Under Part 5 of the Electricity Industry Participation Code (the Code), the Authority is responsible for investigating any suspected or anticipated undesirable trading situations (UTS).  If the Authority finds that a UTS is developing or has developed, it may take steps in regard to that UTS.The Authority has reached a preliminary finding that the situation existing on 26 March 2011 constitutes a UTS. Read more »