Stage 2 Options

The Commission published a consultation paper on 27 July 2010 with a closing date for submissions of Friday, 24 September 2010. There were 18 submissions.

In response to queries about flow tracing from participants during the consultation period, the Commission published a draft report, "Transpower Asset Usage 2004 - 2008". It includes:

  • a brief overview of the flow-tracing approach (which is quite different to the marginal power flow allocation used as the basis for the Transmission Pricing Methodology some years ago); and
  • illustrations of the electrical energy usage of assets on Transpower’s network, divided among the constituent customers.

Related Documents

Revised transmission review process November 2010

Revised-transmission-review-process-Nov10.pdf | pdf | 65 KB | Modified: 28/09/2011 3:02pm

Transpower Asset Usage 2004 2008 updated 4 November 2010

Transpower-Asset-Usage-2004-2008-updated-4-November-2010.pdf | pdf | 7.8 MB | Modified: 23/05/2011 3:07pm