Responsibility for ensuring there is metering installation for ICP that is not also
Part 10 - Metering
- Table of Contents
- 10.1 Contents of this Part
- 10.2 Authority's discretion and powers
- 10.3 Use of contractors
- 10.4 Participant obligations
- 10.5 References to timing
- 10.6 Participant to provide accurate information
- 10.7 Access to premises in which metering installation located
- 10.8 Requirements for information to be recorded, given, produced, or received
- 10.9 Demarcation of responsibility between metering equipment provider and
- 10.10 Standards used
- 10.11 Categories of metering installation
- 10.12 Interference with metering installation
- 10.13 Electricity conveyed
- 10.14 Unmetered load
- 10.15 Security of metering data
- 10.16 Metering data exchange timing and formats
- 10.17 [Revoked]
- 10.17A Metering equipment providers and ATHs to arrange for regular audits
- 10.17B Authority and participant requested audits
- 10.18 Category 1 metering installations and higher categories of metering installations
- 10.19 Metering equipment provider
- 10.20 Obligations of metering equipment provider
- 10.21 When metering equipment provider's obligations come into effect
- 10.22 Change of metering equipment provider
- 10.23 Termination of metering equipment provider responsibility
- 10.23A Decommissioning of metering installation at ICP
- 10.24 Responsibility for ensuring there is metering installation for ICP that is not also
- 10.25 Responsibility for ensuring there is metering installation for NSP that is not point
- 10.26 Responsibility for ensuring there is metering installation for point of connection
- 10.27 Change in responsibility for ensuring metering installation for point of connection
- 10.28 [Revoked]
- 10.29 When grid owner may connect point of connection to grid
- 10.29A When grid owner may temporarily electrically connect point of connection to
- 10.30 When distributor or embedded network owner may connect NSP that is not point
- 10.30A When distributor may temporarily electrically connect NSP that is not point of
- 10.31 When distributor may connect ICP that is not NSP
- 10.31A When distributor may temporarily electrically connect ICP that is not NSP
- 10.31B When distributor may electrically connect ICP that is not NSP
- 10.32 Reconciliation participant requesting connection of point of connection
- 10.33 When reconciliation participant may temporarily electrically connect point of
- 10.33A When reconciliation participant may electrically connect point of connection
- 10.34 Installation and modification of metering installations
- 10.35 Physical location of metering installations
- 10.36 Reconciliation participant to have arrangement with metering equipment provider
- 10.37 Active and reactive measuring and recording requirements
- 10.38 Certification of metering installations
- 10.39 Responsibility for metering infrastructure integration
- 10.40 General requirements for approval as ATH
- 10.41 Requirements applying to ATHs
- 10.42 ATH's functions and ongoing obligations
- 10.43 Metering installations that are inaccurate, defective, or not fit for purpose to be
- 10.44 Metering installations that are inaccurate, defective, or not fit for purpose to be
- 10.45 Investigation and testing costs
- 10.46 Statement of situation
- 10.47 Correction of defects and inaccuracies in metering installation
- 10.48 Correction of defects and inaccuracies in raw meter data
- 10.49 NSP table
- 10.50 Dispute resolution
- 10.51 Transitional provisions
- Schedule 10.1
- Schedule 10.2
- Schedule 10.3
- Schedule 10.4
- Schedule 10.5
- Schedule 10.6
- Schedule 10.7
- Schedule 10.8
-
Print Clause 10.24
Version: 1st November 2018
Sorry your browser is too old to view the code online.
Please update to a modern web browser (IE9+, Chrome, Firefox, Safari).
Printer-friendly version of the page.
Contact Us
EMAIL: info@ea.govt.nz
Sign up to our newsletter
Subscribe to the Electricity Authority newsletters
© 2019 Copyright material on this site is protected by copyright owned by the Electricity Authority or its licensors. Full copyright statement.