The connection and electrical connection guidelines (guidelines) provide an operational view of the processes for connecting and electrically connecting of network supply points (NSPs) and installation control points (ICPs). The Code requirements for these processes are contained in Parts 10 and 11 of the Electricity Industry Participation Code 2010 (Code). These guidelines also set out best practice for new connections that are ICPs.

Overview

Date Activity
26 Jun 2018 Development: Summary of submission: Connection and electrical connection guidelines Read more
26 Jun 2018 Outcome: We have completed our review and amended the Connection and electrical connection guidelines. Read more
10 Apr – 8 May 2018 Consultation: Connection and electrical connection guidelines Read more