Overview

Date Activity
22 May – 3 Jul 2018 Consultation: List of distributed generation eligible to qualify to receive ACOT, lower North Island Read more
27 Mar 2018 Development: We published the list of distributed generation in the lower South Island that is eligible to qualify for avoided costs... Read more
5 Dec 2017 – 30 Jan 2018 Consultation: List of distributed generation eligible to qualify to receive ACOT, lower South Island Read more
Jun – Aug 2017 Correspondence: Correspondence with Meridian Read more
Feb – Mar 2017 Correspondence: Correspondence with Transpower Read more
Dec 2016 Background: Background Read more