Overview

Date Activity
26 Mar – 30 Apr 2019 Consultation: Proposal to amend the Code to remove constrained on payments to generation dispatched down at its maximum ramp rate. Read more
22 Mar 2019 Background: Constrained-on payments are paid to out of merit generators and dispatchable demand required to meet demand and maintain security. Read more