Code (Clarifying Retail Tariff Plans) Amendment 2026
This amendment to the Electricity Industry Participation Code 2010 (Code) is made under sections 38 and 39(3)(a) of the Electricity Industry Act 2010 (Act) by the Electricity Authority having complied with section 39 of the Act.
Amendment
1 Title
This is the Electricity Industry Participation Code (Clarifying Retail Tariff Plans) Amendment 2026.
2 Commencement
This amendment comes into force on 30 October 2026 immediately after the commencement of the Electricity Industry Participation Code (Improving Access to Product Information) Amendment 2026.
3 Code amended
This amendment amends the Electricity Industry Participation Code 2010.
Part 1
Amendments
to Part 1 of Electricity Industry Participation Code
4 Clause 1.1 amended (Interpretation)
In clause 1.1(1), definition of generally available retail tariff plan,—
(a) in paragraph
(a), insert “any” after “if the consumer
satisfies”; and
(b) in
subparagraph (iii), replace “; but” with “:”; and
(c) after
subparagraph (iii), insert:
(iv) the consumer’s electricity end-use, equipment or load
characteristics; but
Part 2
Amendments to Part 11 of Electricity
Industry Participation Code
Schedule 11.6 amended
5 Form 1 of Schedule 11.6 amended
Replace the second bullet pointed text at paragraph (a)
with:
• information about the retail tariff plan
applicable to the consumer’s ICP, including the relevant product identification
code; and
6 Form
2 of Schedule 11.6 amended
Replace the second bullet pointed text at paragraph (a)
with:
• information about the retail tariff plan
applicable to the consumer’s ICP, including the relevant product identification
code; and
Made at Wellington on 28 September 2026
JOHN HARBORD
Chair
Electricity Authority
Certified
in order for signature:
|
Nichola
Lambie Manager
Legal – Legislation Electricity
Authority 25
September 2026 |
Nick
Crang Consultant
Duncan
Cotterill 24
September 2026 |
|
|
|
|
Explanatory Note
This note is not
part of the amendment but is intended to indicate its general effect.
This amendment to the Electricity Industry Participation
Code 2010 comes into force on 30 October 2026.
The amendment amends Parts 1 and 11 of the Electricity Industry Participation Code 2010 to clarify the definition of ‘generally available retail tariff plan’ and make minor corrections to two forms in Schedule 11.6 relating to the authorisation of an agent to request consumption information on behalf of a consumer.
|
|
|
|
|
This is secondary legislation issued under the authority of the Legislation Act 2019. |
|
|
Title |
Electricity Industry Participation Code (Clarifying Retail Tariff Plans) Amendment 2026 |
|
Instrument ID |
|
|
Empowering provisions |
Electricity Industry Act 2010, section 38 |
|
Date made |
28 September 2026 |
|
Date as at |
Not applicable |
|
Date of publication |
30 September 2026 |
|
Administering agency |
|