Electricity Industry Participation Code (Transmission Pricing
Methodology Related Amendments) Amendment 2026
This amendment to the Electricity Industry Participation Code 2010 (Code) is made under section 38 of the Electricity Industry Act 2010 (Act) by the Electricity Authority having complied with section 39 of the Act.
Amendment
1 Title
This is the Electricity Industry Participation Code (Transmission Pricing Methodology Related Amendments) Amendment 2026.
2 Commencement
This amendment comes into force on 1 April 2027.
3 Code amended
This amendment amends the Electricity Industry Participation Code 2010.
4 Clause 3 of Schedule 12.4 amended (General Definitions)
(1) In clause 3 of Schedule 12.4, insert in their appropriate alphabetical order:
effective pricing year means,—
(a) for
a type A benefit-based charge adjustment event, the first pricing
year that starts after the end of the financial year during which Transpower
determines the type A benefit-based charge adjustment event occurred;
and
(b) for
a type B benefit-based charge adjustment event, the first pricing
year that starts after the date Transpower determines the type B
benefit-based charge adjustment event occurred or will occur
type A benefit-based charge adjustment event means a benefit-based charge adjustment event that is not a type B benefit-based charge adjustment event
type B benefit-based charge adjustment event means a benefit-based charge adjustment event that Transpower determines—
(a) has occurred or will occur during the period
from 1 July to 31 March immediately before the start of a pricing year (pricing
year a); and
(b) can reasonably practicably be factored into Transpower’s calculation of transmission charges for pricing year a, taking into account the time required for Transpower to complete its transmission charges assurance and approval processes before notifying customers of their transmission charges for pricing year a under transmission agreements
(2) In clause 3 of Schedule 12.4, definition of ancillary service BBI, replace “post-2019 BBI’s counterfactual” with “BBI’s counterfactual”.
(3) In clause 3 of Schedule 12.4, revoke the definition of back-dated prudent discount.
(4) In clause 3 of Schedule 12.4, replace the definition of commissioned with:
commissioned—
(a) for an asset, has the meaning in subclause 5(1); and
(b) for a connection investment or interconnection investment (including a BBI), has the meaning in subclause 5(2)
(5) In clause 3 of Schedule 12.4, definition of expected effective full commissioning date, insert “(in the case of grid assets) or started (in the case of transmission alternatives)” after “have been commissioned”.
(6) In clause 3 of Schedule 12.4, replace the definition of first pricing year with:
first pricing year means pricing year 2023
(7) In clause 3 of Schedule 12.4, replace the definition of fully commissioned with:
fully commissioned, for a connection investment or interconnection investment (including a BBI), has the meaning in clause 5(3)
(8) In clause 3 of Schedule 12.4, revoke the definition of high-value intervening BBI.
(9) In clause 3 of Schedule 12.4, definition of market BBI, replace “post-2019 BBI’s counterfactual” with “BBI’s counterfactual”.
(10) In clause 3 of Schedule 12.4, revoke the definition of pre-commencement adjustment event.
(11) In clause 3 of Schedule 12.4, definition of pre-start adjustment event, delete “. To avoid doubt, a pre-start adjustment event may be a pre-commencement adjustment event”.
(12) In clause 3 of Schedule 12.4, replace the definition of pricing year with:
pricing year means a period of 12 months starting on 1 April and ending on 31 March. Pricing year n means the pricing year starting in year n
(13) In clause 3 of Schedule 12.4, definition of reliability BBI, replace “post-2019 BBI’s counterfactual” with “BBI’s counterfactual”.
(14) In clause 3 of Schedule 12.4, definition of replacement cost, delete “and subject to subclause 34(5)”.
(15) In clause 3 of Schedule 12.4, revoke the definition of replacement cost adjustment factor.
(16) In clause 3 of Schedule 12.4, definition of resiliency BBI, insert “high-value” before “post-2019 BBI”.
(17) In clause 3 of Schedule 12.4, definition of start pricing year, delete “and subject to paragraph 122(2)” in each place.
(18) In clause 3 of Schedule 12.4, revoke the definition of substantial sustained increase.
(19) In clause 3 of Schedule 12.4, replace the definition of Transpower IPP with:
Transpower IPP means the Transpower Individual Price-Quality Path Determination 2025 [2024] NZCC 26
5 Clause 5 of Schedule 12.4 amended (Commissioning)
(1) In clause 5(1) of Schedule
12.4, replace “first commissioned as defined in the Transpower IMs” with “ready for its
intended use following testing”.
(2) In clause 5 of Schedule
12.4, replace subclause (4) with:
(4) Subject to subclauses (1) to (3), the time
an asset, transmission
alternative, connection investment or interconnection investment (including a BBI) is commissioned (in the case of an asset), started (in the case of a transmission alternative) or fully
commissioned (in the case of a connection investment or interconnection
investment) is to be determined by Transpower.
6 Clause 6 of Schedule 12.4 replaced (Connection and Disconnection)
Replace clause 6 of Schedule 12.4 with:
6 Connection
and Disconnection
(1) Subject to subclause (2), the time an asset becomes connected to or disconnected from a network or plant is to be determined by Transpower.
(2) For the purposes of this transmission pricing methodology, unless the context otherwise requires—
(a) an asset is not treated as connected to a network or plant when it is electrically connected to the network or plant only for the purposes of commissioning tests for the asset; and
(b) an asset is treated as disconnected from a network or plant if it is permanently electrically disconnected from the network or plant; and
(c) an asset may be treated as either connected to or disconnected from a network or plant when it is temporarily electrically disconnected from the network or plant, as determined by Transpower; and
(d) plant is grid-connected only if it is directly connected to the grid; and
(e) embedded plant is connected to a local network or grid-connected plant if the embedded plant is—
(i) directly connected to the local network or grid-connected plant; or
(ii) indirectly connected to the local network or grid-connected plant through
other plant or a non-grid network.
7 Clause 26 of Schedule 12.4 amended
(Asset Component)
In clause 26(3) of Schedule 12.4, insert “Neither the anticipatory connection asset, the larger connection asset, nor the non-anticipatory part of the larger connection asset (if any) is required to be an investment contract asset.” after “not anticipatory for the pricing year.”.
8 Clause 27 of Schedule 12.4 amended
(Anticipatory BBIs)
(1) In clause 27(2) of Schedule 12.4, replace “commissioned BBI” with “commissioned post-2019 BBI”.
(2) In clause 27(2)(d) of Schedule 12.4,—
(a) replace “simple method, subject to the modifications in subclause (3)” with “price-quantity method,”; and
(b) insert “not” before “more”.
(3) Revoke clause 27(3) of Schedule 12.4.
9 Clause 34 of Schedule 12.4 amended
(Replacement Costs)
In clause 34 of Schedule 12.4,—
(a) revoke subclause (2); and
(b) revoke subclause (5).
10 Clause 39 of Schedule 12.4 amended
(Covered Cost)
(1) In clause 39(1) of Schedule 12.4, replace “preceding financial year calculated” with “pricing year calculated” in each place.
(2) In the chapeau of clause 39(2) of Schedule 12.4, replace “financial year (C)” with “pricing year (C)”.
(3) In clause 39(2)(a) of Schedule 12.4,—
(a) replace “opening RAB value for the financial year” with “opening RAB value for the preceding financial year”; and
(b) replace “start of the financial year” with “start of the pricing year”; and
(c) replace “subclause 7, the opening RAB value for the asset and financial year” with “subclause (7), the opening RAB value for the asset and preceding financial year”.
(4) In clause 39(2)(b) of Schedule 12.4,—
(a) replace “commissioned during the financial year” with “commissioned during the preceding financial year”; and
(b) replace “start of the financial year” with “start of the pricing year”; and
(c) replace “month of the financial year” with “month of the preceding financial year”.
(5) In clause 39(3) of Schedule 12.4,—
(a) replace “financial year (Tdep)” with “pricing year (Tdep)”; and
(b) replace “start of the financial year” with “start of the pricing year”; and
(c) replace “during the financial year” with “during the preceding financial year” in each place; and
(d) replace “financial year calculated” with “pricing year calculated”.
(6) In clause 39(4) of Schedule 12.4,—
(a) replace “financial year (I)” with “pricing year (I)”; and
(b) replace “the asset and financial year” with “the asset and preceding financial year”; and
(c) replace “start of the financial year” with “start of the pricing year” in each place.
(7) In clause 39(5) of Schedule 12.4, replace “financial year” with “pricing year” in each place.
11 Clause 42 of Schedule 12.4 amended (BBI
Customer Allocations for Appendix A BBIs)
In clause 42(1) of Schedule 12.4, replace “Subject to paragraph 75(5)(a), for” with “For”.
12 Clause 43 of Schedule 12.4 amended (BBI
Customer Allocations for Post-2019 BBIs)
In clause 43 of Schedule 12.4,—
(a) in subclause (2), replace “subclauses (3) and (4A)” with “subclause (4A)”; and
(b) revoke subclause (3); and
(c) revoke subclause (4).
13 Clause 44 of Schedule 12.4 amended
(Overview of Price-quantity Method)
Replace clause 44(1)(b) of Schedule 12.4 with:
(b) only to—
(i) those post-2019 BBIs to which Transpower
applies the price-quantity
method in accordance with subclause 43(2); and
(ii) anticipatory BBIs.
14 Clause 51 of Schedule 12.4 amended
(Calculation of Market Regional NPB based on Quantity)
(1) In clause 51(3) of Schedule 12.4, replace paragraphs (b) to (e) with:
(b) the period or periods during which the market BBI is modelled to generate its
primary market benefits, as determined by Transpower (the periods of benefit),
as follows:
(i) for a regional demand group, quantities in the counterfactual are positive if
there are alleviated prices for the regional demand group during the periods
of
benefit and
negative if there are exacerbated prices for the regional
demand group during the periods of benefit:
(ii) for a regional supply group, quantities in the counterfactual are positive if
there are exacerbated prices for the regional supply group during the
periods of benefit and negative if there are alleviated prices for the regional
supply group during the periods of benefit:
(iii) subject to subclause (4), for a regional demand
group or regional supply
group, the positive or negative quantities under subparagraph (i) or (ii) (as
appropriate) are summed with the changes in quantities between the factual
and counterfactual during all periods, an increase being positive and a
decrease being negative, the sum being the expected market benefit or
disbenefit.
(2) In clause 51(4) of Schedule 12.4, replace “paragraph (3)(e)” with “subparagraph (3)(b)(iii)”.
(3) In clause 51(5) of Schedule 12.4, replace “paragraphs (3)(c) and (3)(d)” with “subparagraphs (3)(b)(i) and (3)(b)(ii)”.
15 Clause 52 of Schedule 12.4 amended
(Calculation of Market Regional NPB based on Price and Quantity)
(1) In clause 52(3)(b) of Schedule 12.4:
(a) in subparagraph (i), replace “; or” with “.”; and
(b) revoke subparagraph (ii).
(2) In clause 52(4)(b) of Schedule 12.4:
(a) in subparagraph (i), replace “; or” with “.”; and
(b) revoke subparagraph (ii).
16 Clause 59 of Schedule 12.4 amended
(Overview of Simple Method)
In clause 59(1) of Schedule 12.4,—
(a) replace “64” with “64A”; and
(b) revoke paragraph (b)(ii); and
(c) revoke paragraph (b)(iv).
17 Clause 61 of Schedule 12.4 amended
(Individual NPB)
(1) Replace clause 61(1) of Schedule 12.4 with:
(1) A customer’s individual NPB
for a BBI in an investment region (NPB) is calculated as follows:
![]()
where
%20Amendment%202026%20(HTML).files/image005.png)
|
RNPBg |
is regional NPB for regional customer group g, where regional customer group g is a regional customer group for the BBI— (a) that has positive regional NPB in respect of the investment region; and (b) of which the customer is a member |
|
|
|
|
SMFg |
is the customer’s simple method factor for regional
customer group g |
|
|
|
|
F |
is: (a) the demand factor, where regional customer group g is a regional demand group and the customer
is a member of that regional demand group due to its offtake
for battery storage; and |
|
|
(b) otherwise 1. |
(1A) Transpower must—
(a) continue
to use existing customers’ individual NPBs calculated under subclause
(1) before it was amended by the Electricity Industry Participation Code
(Transmission Pricing Methodology Related Amendments) Amendment 2026 until 31
March 2027; and
(b) recalculate
existing customers’ individual NPBs calculated under subclause (1) in
accordance with subclause (1) as amended by the Electricity Industry
Participation Code (Transmission Pricing Methodology Related Amendments) Amendment
2026 with those calculations applying on and after 1 April 2027.
(2) In clause 61(6)(b) of Schedule 12.4, replace “commissioned” with “commissioned”.
18 Clause 63 of Schedule 12.4 amended
(Regional Customer Groups)
In clause 63 of Schedule 12.4, replace “Subject to subclause 27(3), the” with “The”.
19 Clause 75 of Schedule 12.4 amended
(Adjustment Events)
(1) Replace clause 75(1) of Schedule 12.4 with:
(1) Subject to subclause (4), Transpower determines when an adjustment event occurs.
(2) After clause 75(1) of Schedule 12.4, insert:
(1A) This transmission pricing methodology—
(a) as it was before amendment by the Electricity Industry
Participation Code (Transmission Pricing Methodology Related Amendments)
Amendment 2026 applies to any benefit-based charge adjustment event that
occurred before 1 April 2027; and
(b) as it
is after amendment by the Electricity Industry Participation Code (Transmission
Pricing Methodology Related Amendments) Amendment 2026 applies to any benefit-based
charge adjustment event that occurred, occurs or is expected to occur on or
after 1 April 2027.
(3) In clause 75(3) of Schedule 12.4, insert “, to the extent necessary,” after “Transpower must”.
(4) In clause 75(4)(b) of Schedule 12.4, replace “during the start pricing year” with “in accordance with clause 81A”.
(5) Revoke clause 75(5) of Schedule 12.4.
(6) Replace clause 75(6) of Schedule 12.4 with:
(6) Unless a pre-start adjustment event is a SSCGU, Transpower is not required to (but may) factor the pre-start adjustment event into its calculation of regional NPB under paragraph (4)(a).
(7) Replace clause 75(7) of Schedule 12.4 with:
(7) Subclause (4) does not apply to a pre-start adjustment event that is a specified pre-start adjustment event to which subclause 65(13) applies.
(8) Revoke clause 75(8) of Schedule 12.4.
20 Clause 77 of Schedule 12.4 amended
(Connection Charge Adjustment Event: Connecting Customer)
(1) In clause 77(3)(a) of Schedule 12.4, replace “connection location” with “connecting customer’s new connection location (the new connection location)”.
(2) In clause 77(3)(b) of Schedule 12.4, replace “(as applicable depending on Transpower’s determination under paragraph (a) for the connection location” with “for the new connection location (as applicable depending on Transpower’s determination under paragraph (a) for the new connection location)”.
(3) In clause 77(3)(b)(ii) of Schedule 12.4, replace “connection location” with “new connection location or any other connection location”.
(4) Replace clause 77(3)(c) of Schedule 12.4 with:
(c) calculate or re-calculate (as the case may be) all customers’ connection customer allocations for—
(i) the new connection location; and
(ii) each other connection location where the connecting customer’s AMDC or
AMIC affects connection customer allocations,
(the relevant connection locations) to account for the connecting customer’s AMDC or AMIC estimated under paragraph (b); and
(5) In clause 77(3)(d) of Schedule 12.4, replace “connection location” with “relevant connection locations”.
(6) Replace clause 77(3)(e) of Schedule 12.4 with:
(e) calculate or re-calculate (as the case may be) all customers’ connection charges for any relevant connection transmission alternative—
(i) to account for the customers’ annual connection charge for the relevant
connection locations calculated or re-calculated under paragraph (d); and
(ii) assuming those annual connection charges applied for the previous pricing
year.
(7) In clause 77(4) of Schedule 12.4, replace “connection location or connection transmission alternative from the date the connecting customer connected at the connection location” with “relevant connection locations or connection transmission alternatives from the date the connecting customer connected at the new connection location”.
(8) In clause 77(5) of Schedule 12.4, replace “connection location or connection transmission alternative” with “relevant connection locations or connection transmission alternatives” in each place.
21 Clause 80 of Schedule 12.4 amended
(Connection Charge Adjustment Event: Voluntary Under-recovery)
In clause 80(4) of Schedule 12.4, replace “1 month of” with “1 month before”.
22 Clause 81 of Schedule 12.4 amended
(Benefit-based Charge Adjustment Events)
(1) In clause 81(1) of Schedule 12.4,—
(a) revoke paragraph (f); and
(b) revoke paragraph (g).
(2) Revoke clause 81(4) of Schedule 12.4.
(3) In clause 81(8) of Schedule 12.4, delete “86,” in each place.
(4) In clause 81(9) of Schedule 12.4,—
(a) revoke paragraph (a); and
(b) in paragraph (b), replace “; and” with “.”; and
(c) revoke paragraph (c).
23 New clause 81A of Schedule 12.4 inserted
After clause 81 of Schedule 12.4, insert:
81A Timing of Adjustments for Benefit-based
Charge Adjustment Events
(1) Subject
to subclauses (2) and (3), for the purpose of adjusting benefit-based
charges for a benefit-based charge adjustment event, the benefit-based
charge adjustment event is deemed to have occurred—
(a) at
the start of the benefit-based charge adjustment event’s effective pricing
year; and
(b) simultaneously
with all other benefit-based charge adjustment events deemed to have
occurred at the start of that effective pricing year.
(2) Subclause
(1) does not apply to the benefit-based charge adjustment events in
paragraphs 81(1)(j), 81(1)(k) and 81(1)(l).
(3) For
the purpose of adjusting benefit-based charges for the benefit-based
charge adjustment event in paragraph 81(1)(c), the benefit-based charge
adjustment event is deemed to have occurred immediately for the exiting customer (but not for any other customer).
(4) To
avoid doubt, subclause (3) does not apply to any notional exiting customer.
(5) For
the purpose of applying paragraph 83(3)(d), 83(5C)(c)
or 83(6)(b) or subparagraph 84(3)(a)(ii) to 2 or more benefit-based charge
adjustment events deemed to have occurred simultaneously under subclause
(1)—
(a) the
variable CA in paragraph 83(3)(d), 83(5C)(c) or
83(6)(b), as applicable, is the total of all new customers’ and notional
new customers’ BBI customer allocations for the relevant BBI; and
(b) the
variable CA in subparagraph 84(3)(a)(ii) is the total of all notional exiting customers’
BBI customer allocations for the relevant BBI.
(6) Transpower does not breach subclause
81(2) if —
(a) Transpower factors an expected type B benefit-based charge adjustment event into its calculation of transmission charges for a pricing year; and
(b) the expected type B benefit-based charge adjustment event does not occur on or before 31 March immediately before the start of the pricing year; and
(c) Transpower chooses to delay any incremental benefit-based charge attributable to the expected type B benefit-based charge adjustment event until Transpower determines it has occurred.
24 Clause 82 of Schedule 12.4 amended
(Benefit-based Charge Adjustment Event: Material Damage)
(1) In clause 82(2) of Schedule 12.4,—
(a) revoke paragraph (a); and
(b) in paragraph (b), replace “subsequent pricing year” with “pricing year from and including the benefit-based charge adjustment event’s
effective pricing year”.
(2) Revoke
clause 82(5) of Schedule 12.4.
(3) Revoke clause 82(6) of Schedule 12.4.
25 Clause 83 of Schedule 12.4 amended (Benefit-based Charge Adjustment Event: New Customer)
(1) Revoke clause 83(10) of Schedule 12.4.
(2) Revoke clause 83(11) of Schedule 12.4.
26 Clause 84 of Schedule 12.4 amended
(Benefit-based Charge Adjustment Event: Exiting Customer)
(1) In clause 84(3)(a)(iii), replace “; and” with “.”.
(2) Revoke clause 84(3)(b) of Schedule 12.4.
(3) In clause 84(5) of Schedule 12.4,—
(a) revoke paragraph (a); and
(b) in paragraph (b)(iii), delete “or a high-value intervening BBI under the simple method”; and
(c) in paragraph (b)(iv), replace “any other” with “a”.
(4) In clause 84(6) of Schedule 12.4,—
(a) in paragraph (a), replace “the Bunnythorpe Haywards Appendix A BBI, a post-2019 BBI under a standard method or a high-value intervening BBI under the simple method” with “a post-2019 BBI under a standard method”; and
(b) in paragraph (b), replace “any other” with “a”.
27 Clause 85 of Schedule 12.4 amended
(Benefit-based Charge Adjustment Event: Large Plant Connected or Disconnected)
(1) In clause 85(4) of Schedule 12.4,—
(a) revoke paragraph (a); and
(b) in paragraph (b)(iii), delete “or a high-value intervening BBI under the simple method”; and
(c) in paragraph (b)(iv), replace “any other” with “a”.
(2) In clause 85(5) of Schedule 12.4,—
(a) in paragraph (a), replace “the Bunnythorpe Haywards Appendix A BBI or a post-2019 BBI under a standard method or a high-value intervening BBI under the simple method” with “a post-2019 BBI under a standard method”; and
(b) in paragraph (b), replace “any other” with “a”.
28 Clause 86 of Schedule 12.4 revoked
(Benefit-based Charge Adjustment Event: Substantial Sustained Increase)
Revoke clause 86 of Schedule 12.4.
29 Clause 88 of Schedule 12.4 amended
(Benefit-based Charge Adjustment Event: Changed Point of Connection)
In clause 88 of Schedule 12.4,—
(a) in subclause (3)(b), replace “subclause 85(5)” with “subclauses 85(4) to 85(6)”; and
(b) in subclause (4)(b), replace “subclause 85(5)” with “subclauses 85(4) to 85(6)”.
30 Clause 90 of Schedule 12.4 amended
(Benefit-based Charge Adjustment Event: Voluntary Under-recovery)
In clause 90(4) of Schedule 12.4, replace “1 month of” with “1 month before”.
31 Clause 95 of Schedule 12.4 amended
(Residual Charge Adjustment Event: Voluntary Under-recovery)
In clause 95(4) of Schedule 12.4, replace “1 month of” with “1 month before”.
32 Clause 107 of Schedule 12.4 amended
(Reversal for Increased Forecast Peak Loading)
In clause 107(2)(b)(i) of Schedule 12.4, replace “BBI adjustment factor” with “BBI reassignment factor”.
33 Clause 122 of Schedule 12.4 revoked
(Back-dated Prudent Discounts)
Revoke clause 122 of Schedule 12.4.
Made at Wellington on 9 November 2026
John Harbord
Chair
Electricity Authority
Certified in order for signature:
Nicholai Mumford Rachael
Brown
Senior Legal Counsel Partner
Electricity Authority Bell
Gully
5 November 2026 5
November 2026
|
|
|
|
Explanatory Note
This note is not part of the amendment but is
intended to indicate its general effect.
This
amendment to the Electricity Industry Participation Code 2010 (Code) comes into
force on 1 April 2027.
The amendment
amends the transmission pricing methodology (TPM) in Schedule 12.4 of the Code
to:
(a) refine the simple method treatment of battery storage so that
battery storage is not charged disproportionately compared to other supply
technologies:
(b) remove the two-year lag between when an updated weighted average
cost of capital applies to determine Transpower’s maximum allowable revenue,
and when it applies to calculate benefit-based charges (BBCs):
(c) use the standard method (instead of the simple method) to
allocate 50% of the capital cost of anticipatory connection capacity:
(d) enable the processing of BBC adjustments in one annual batch:
(e) remove the ‘substantial sustained increase’ adjustment event for
BBCs:
(f) make minor amendments to the drafting of the TPM to improve
clarity and remove redundant provisions.
More information about the
amendments is available on the Electricity Authority’s website
https://www.ea.govt.nz/
|
|
|
|
|
This is secondary legislation issued under the
authority of the Legislation Act 2019. |
|
|
Title |
Electricity Industry Participation Code
(Transmission Pricing Methodology Related Amendments) Amendment 2026 |
|
Instrument ID |
ELA 2026/25 |
|
Empowering provisions |
Electricity Industry Act 2010, s 38 |
|
Date made |
09/11/2026 |
|
Date as at |
Not applicable |
|
Date of publication |
23/11/2026 |
|
Administering agency |
Electricity Authority |