Electricity Industry Participation Code (Automatic Under-Frequency Load Shedding Compliance) Amendment 2026

 

This amendment to the Electricity Industry Participation Code 2010 (Code) is made under section 38 of the Electricity Industry Act 2010 (Act) by the Electricity Authority having complied with section 39 of the Act.

 

 

 

Contents

 

1

Title

1

2

Commencement

1

3

Code amended

1

4

New clause 8.28A inserted (Annual director certification of compliance with specified obligations under this Part)

2

 

8.28A  Annual director certification of compliance with specified obligations under this Part

 

 

 

 

 

Amendment

 

1        Title

This is the Electricity Industry Participation Code (Automatic Under-Frequency Load Shedding Compliance) Amendment 2026.

 

2        Commencement

This amendment comes into force on 1 February 2027.

         

3        Code amended

This amendment amends the Electricity Industry Participation Code 2010.

 

4        New clause 8.28A inserted (Annual director certification of compliance with specified obligations under this Part)

          After clause 8.28, insert:

8.28A Annual director certification of compliance with specified obligations under this Part

(1)     This clause applies to—

(a)     connected asset owners with obligations to provide automatic under-frequency load shedding under this Part; and

(b)     South Island grid owners.

(2)     Each participant referred to in subclause (1) must certify to the Authority, on an annual basis, whether the participant has complied with the requirements in the following clauses, to the extend they applied to the participant and relate to automatic under-frequency load shedding, during the preceding calendar year:

(a)     clause 8.19(5):

(b)     clause 8.28(1):

(c)     clause 8.37(1) and (3):

(d)     Schedule 8.3, Technical Code A, clause 8(1) and (2):

(e)     Schedule 8.3, Technical Code B, clause 7(1), (2), (3), (4), (6AB), (7), (9), and (18).

(3)     Each certification must be—

(a)     submitted by 1 June of each year for the preceding calendar year; and

(b)     in the prescribed form published by the Authority; and

(c)     signed by a director of the participant.

(4)     The Authority may share certifications provided to it under subclause (2) with the system operator.

 

Made at Wellington on 25 November 2026

 

 

JOHN HARBORD

Chair

Electricity Authority

 

Certified in order for signature:

                                                           

Nichola Lambie                                                          Olivia Lund

Manager Legal – Legislation                                      Partner

Electricity Authority                                                   Duncan Cotterill

12 November 2026                                                     20 November 2026

 

 

 

 

 

Explanatory Note

 

This note is not part of the amendment but is intended to indicate its general effect.

 

This amendment to the Electricity Industry Participation Code 2010 (the Code) comes into force on 1 February 2027.

 

The amendment amends Part 8 of the Code to require connected asset owners with obligations to provide automatic under-frequency load shedding (AUFLS), and South Island grid owners, to provide annual director certification to the Authority of their compliance with requirements in Part 8 that relate to the provision of AUFLS and maintenance of AUFLS systems. The objective of the amendment is to strengthen accountability and provide greater assurance that participants with AUFLS obligations are meeting their Code obligations.

 

 

 

 

This is secondary legislation issued under the authority of the Legislation Act 2019.

Title

Electricity Industry Participation Code (Automatic Under-Frequency Load Shedding Compliance) Amendment 2026

Instrument ID

ELA 2027/27

Empowering provisions

Electricity Industry Act 2010, s 38

Date made

25/11/2026

Date as at

Not applicable

Date of publication

26/11/2026

Administering agency

Electricity Authority