Efficient network infrastructure investment and operation
Dispatch service enhancement
Delivering improved flexibility and resilience of the system used to communicate and acknowledge dispatch instructions.
Overview
We have amended the Code and the Approved Systems Document to enable the system operator to replace their Generator Communication (GenCo) software for issuing electronic dispatch instructions. GenCo is ageing, proprietary software that will soon become unsupported. The system operator’s DSE project will replace GenCo by adopting two alternate communication protocols for dispatch: Inter-Control Center Communications Protocol (ICCP) and web services.
- ensuring secure and reliable delivery of dispatch communications
- reducing technical barriers to market entry and participation, including for new technologies and business models
- increasing flexibility and reducing complexity of the dispatch service.
Timeline
-
14 September - 31 December 2020
Development —Transition period for updates to new dispatch services and software enhancements
-
11 September 2018
Event —Workshop for Transpower's Dispatch Services Enhancement project
-
14 August 2018
Decision —Code amendment to enable the replacement of the Generator Communication (GenCo) dispatch software via Transpower's Dispatch Service Enhancement (DSE) project
-
10 April to 22 May 2018
Consultation —Enabling the system operator's dispatch service enhancements projectView consultation
Project background
The system operator uses software to issue dispatch instructions to market participants. This system was called Generator Communication (GenCo) and had issues inherent to it which necessitated a replacement of the system. It was a barrier to entry into the market, had reliability and support issues, and hindered participants in the upgrading and maintenance of their own systems.
The dispatch service enhancement project (previously the Electronic Dispatch Facility Phase III project) will deliver improved flexibility and resilience of the system used to communicate and acknowledge dispatch instructions. This project investigated amending the Code to allow for more flexibility for participants to use their own systems and software for dispatch instructions, such as allowing for automated responses and increased technicality of business models and technologies.
Other projects in Efficient network infrastructure investment and operation
View all projectsSettlement residual allocation methodology
How the settlement residue is allocated amongst transmission customers, as prescribed in the Code.
Code review programme
Code review programmes address various themes or issues that arise in the Code.