Electricity Industry Participation Code Amendment (Controllable Load) 2024
Downloads
-
Controllable load 2024 - Certified instrument28 March 2024, 4 pages
Related documents
-
Code amendment omnibus #2 - Decision paper28 March 2024, 40 pages
-
Code amendment omnibus #2 - Consultation paper15 December 2023, 38 pages
Explanatory note
This note is not part of the amendment, but is intended to indicate its general effect.
This amendment to the Electricity Industry Participation Code ("Code") comes into force on 1 May 2024. The amendment amends clause 1.1 and Schedule 8.3, Technical Code B of the Code to clarify the availability and use of 'controllable load'. The amendments allow the system operator to request that distributors provide an indication of their available controllable load by submitting difference bids to the system operator (unless an alternative form is agreed). This will provide the system operator with greater information as to the expected quantity of available controllable load that may be shed by a distributor when instructed to do so during a grid emergency.
Legislative information
Title | Electricity Industry Participation Code Amendment (Controllable Load) 2024 |
---|---|
Principal or amendment | Amendment |
Consolidated version | No |
Empowering Act and provisions | Electricity Industry Act 2010, section 38 |
Replacement empowering Act and provisions | Not applicable |
Maker name | Electricity Authority |
Administering agency | Electricity Authority |
Date made | 26 March 2024 |
Publication date | 27 March 2024 |
Notification date | 27 March 2024 |
Commencement date | 1 May 2024 |
End date | Not applicable |
Consolidation as at date | Not applicable |
Related instruments | Electricity Industry Participation Code 2010 |