Electricity Industry Participation Code (Network Connections) Amendment 2026
Downloads
-
Electricity Industry Participation Code (Network Connections) Amendment 2026 (pdf)11 February 2026, 80 pages
Related documents
-
Network connections project (stage one) technical consultation – Decision paper16 December 2025, 186 pages
-
Network connections project (stage one) - Decision paper12 December 2025, 121 pages
-
Network connections project (stage one) Code drafting - Technical consultation paper9 September 2025, 243 pages
-
Network connections project: stage one amendments - consultation paper10 October 2024, 229 pages
Explanatory note
This amendment to the Electricity Industry Participation Code 2010 comes into force on 1 December 2026, except for clauses 39 to 61 which come into force on 1 June 2027.
The amendment amends Parts 1 and 6 of the Electricity Industry Participation Code 2010 (“Code”) to update the application processes for the connection of distributed generation and insert new application processes for the connection of load as part of the Authority’s Network Connections Project (Stage 1) by:
(a) replacing the application processes for connecting distributed generation of less than 10kW to distribution networks with two new processes, set out in Appendices 1 and 1A of Schedule 6.1;
(b) introducing a new application process for connecting distributed generation above 10kW but below 300kW, set out in Appendix 2 of Schedule 6.1;
(c) replacing the application process for connecting distributed generation over 10kW with a new process for connecting distributed generation of above 300kW, set out in Appendix 3 of Schedule 6.1;
(d) introducing a new application process for the connection of load above 69kVA and below 500kVA, set out in Appendix 4 of Schedule 6.1;
(e) introducing a new application process for the connection of load above 500kVA, set out in Appendix 5 of Schedule 6.1;
(f) introducing new requirements for distributors in managing and prioritising applications to connect, including the introduction of the obligation to maintain a network connections pipeline in accordance with the queueing and management policy that is to be developed jointly by distributors;
(g) amending the information that distributors must publish and what information is confidential, providing for better protection of information that is commercially sensitive to applicants; and
(h) making further consequential amendments to reflect these updated and new application processes.
The new processes introduced by the amendment will come into force in two stages with the amendments relating to connection of distributed generation taking effect on 1 December 2026 and the amendments relating to connection of load taking effect on 1 June 2027.
Legislative information
| Title | Electricity Industry Participation Code (Network Connections) Amendment 2026 |
|---|---|
| Principal or amendment | Amendment |
| Consolidated version | No |
| Empowering Act and provisions | Electricity Industry Act 2010, section 38 |
| Replacement empowering Act and provisions | Not applicable |
| Maker name | Electricity Authority |
| Administering agency | Electricity Authority |
| Date made | 9 February 2026 |
| Publication date | 11 February 2026 |
| Notification date | 11 February 2026 |
| Commencement date | 1 December 2026 |
| End date | Not applicable |
| Consolidation as at date | Not applicable |
| Related instruments | Electricity Industry Participation Code 2010 |