Electricity Industry Participation Code Amendment (Transmission Pricing) 2015
Downloads
-
Electricity Industry Participation Code Amendment (Transmission Pricing) 20151 April 2017, 7 pages
Related documents
-
Appendix A - Drafting showing proposed changes to the Code25 August 2015, 40 pages
-
Appendix A - Drafting showing proposed changes to the Code4 August 2015, 40 pages
-
Transpower's proposed variation to the Transmission Pricing Methodology - Summary of submissions4 August 2015, 20 pages
-
Appendix B - Proposed Code amendment23 June 2015, 42 pages
Explanatory note
This amendment to the Electricity Industry Participation Code 2010 comes into force on 1 April 2017.
The amendment is the result of a review of the transmission pricing methodology in Schedule 12.4 of the Code. The review was initiated by Transpower under clause 12.85 of the Code.
The amendment changes the definition of regional peak demand periods so that the calculation of the periods for the Upper North Island and the Upper South Island regions is based on the 100 highest regional demands in the relevant capacity measurement period. This means that the calculation of regional peak demand periods for all four regions will be based on the 100 highest regional demands. The description of each region has also been clarified.
The amendment changes the definition of capacity measurement period for the purpose of determining regional peak demand periods, so that summer trading periods are excluded for the Lower South Island, Lower North Island, and Upper North Island regions.
HVDC charges (charges for the HVDC link) will continue to be paid by South Island generators. The amendment provides for a transition from the current HAMI-based charge to a charge based on the total injection by each South Island generator at each South Island generation connection location, averaged over five years.
Finally, the amendment requires Transpower to make adjustments to minimise the effect on transmission charges of reverse flow that occurs as a result of a GXP tie.
Legislative information
| Title | Electricity Industry Participation Code Amendment (Transmission Pricing) 2015 |
|---|---|
| Principal or amendment | Amendment |
| Consolidated version | No |
| Empowering Act and provisions | Electricity Industry Act 2010, section 38 |
| Replacement empowering Act and provisions | Not applicable |
| Maker name | Electricity Authority |
| Administering agency | Electricity Authority |
| Date made | 24 August 2015 |
| Notification date | 27 August 2015 |
| Commencement date | 1 April 2017 |
| End date | Not applicable |
| Consolidation as at date | Not applicable |
| Related instruments | Electricity Industry Participation Code 2010 |