General news
Authority starts investigating self-reported breaches by Genesis Energy
- Code
- Compliance
The Electricity Authority Te Mana Hiko has started an investigation into self-reported breaches of the Electricity Industry Participation Code 2010 (Code) by Genesis Energy Limited.
Genesis Energy self-reported that it breached Part 13 clause 13.82(2) and Part 13 clause 13.82(3) of the Code on 26 January 2024.
This event relates to an alleged failure by Genesis Energy to comply with dispatch instructions at Huntly Unit 5 and failure to immediately advise the system operator of the circumstances for not complying with the dispatch instructions.
If any participant considers it is affected by the alleged breaches and wishes to join the investigation, it should contact the appointed investigator by 5pm on 27 March 2025.
The investigator can be contacted by:
- email at compliance@ea.govt.nz with reference 2403GENE1 in the subject line
- our Compliance portal
- post at Compliance Investigator, Electricity Authority Te Mana Hiko, PO Box 10041, Wellington 6011.
Related News
Seeking feedback on 23 October 2025 under-frequency event
The Electricity Authority Te Mana Hiko is seeking feedback from electricity market participants who may have been substantially affected by an under-frequency …
Amendments to hedge disclosure obligations take effect on 1 August 2026
Amendments to the hedge disclosure obligations in subpart 5 of Part 13 of the Electricity Industry Participation Code take effect on 1 August 2026.
New operators approved for Type B co-generating stations
The Electricity Authority Te Mana Hiko has approved applications from New Zealand Steel Limited and Whareroa Cogeneration Limited to operate plants at Glenbroo…