Decision on 11 April 2024 under-frequency event
- Generation
- Compliance
The Electricity Authority Te Mana Hiko's final determination is that Genesis Energy Limited, as the generator that owns Huntly Unit 4, was the causer of the 11 April 2024 under-frequency event (UFE).
The Authority's reasons for this final determination are:
- A UFE occurred at 12.25am on 11 April 2024 when frequency dropped to 49.17Hz in the North Island and 49.25Hz in the South Island
- The interruption/reduction of electricity occurred at the grid injection point for Huntly Unit 4, which belongs to Genesis
- No other asset was identified as having caused or potentially caused the UFE
- Genesis agreed with the system operator’s assessment that Genesis was the causer of the UFE
- The Authority did not receive any feedback that disputed its draft determination.
In accordance with clause 8.65 of the Electricity Industry Participant Code, the clearing manager will rebate the event charges to the relevant participants. The event charge calculated in the system operator’s report to the Authority is $205,003.75.
Any dispute of this final determination can be lodged with the Rulings Panel via registrar@electricityrulingspanel.nz by 5pm, 17 December 2024.
Related News
Hedge disclosure certificates due by 30 June
Participants in the hedge market are required to submit an annual hedge disclosure certificate and must do so by 30 June 2026 under clause 13.230 of the El…
Case study: Submitting a material change audit
We have published a case study for industry participants who are required to provide material change audits. A material change audit is required when an indust…
New rules encourage more solar to networks
More solar energy systems – big and small – will soon be able to supply more electricity to local networks, following decisions announced today by the Electric…