Wholesale market arrangements for battery energy storage systems: Code amendment consultation
Decision
Thank you to everyone who provided feedback. After considering all submissions, we've decided to amend the Code to improve wholesale market operations for utility-scale battery energy storage systems (BESSs) and support related software updates.
BESSs can play a critical role in maintaining security and resilience, especially as New Zealand transitions to a more variable power system. They can help balance intermittent generation from solar and wind, support efficient investment, and reduce electricity prices for all consumers. To unlock these benefits, regulatory settings governing BESSs must be fit-for-purpose.
We have decided to proceed with the proposed amendment, with some changes.
We will implement the amendment in two phases because the software upgrades will take time to deliver:
Initial phase – from 30 October 2026
- BESSs will be required to be dispatchable when consuming
- As an interim measure, BESS owners will be able to trade based on their expected capabilities and update trade quantities after gate closure if expected capability changes
Final phase from – 31 March 2028
- BESS owners will be able to trade their full capacity with the introduction of state-of-charge constraints
- BESS owners will submit bids to charge and offers to discharge using a single trade form and receive a single dispatch for their system.
- All BESSs will have a one-hour gate closure regardless of their connection type and operational state.
The main change from our proposal is that the move to a one-hour gate closure for embedded BESSs will now be deferred until 31 March 2028.
We intend to:
- release a Code amendment consultation in late 2026 that will cover wholesale market arrangements for BESS-hybrid stations. This will follow from the Common quality and wholesale market arrangements for BESS and BESS-hybrids issues and options paper
- before 31 March 2028, hold workshops to take BESS owners through the details of the final phase of the Code amendment.
Consultation
Following our wholesale market arrangements for battery energy storage systems issues and options paper, we sought feedback on the proposed Code amendment necessary to address key issues with existing wholesale market arrangements for BESS.
Webinar on the Code amendment consultation and Common quality and wholesale market arrangements for BESS and BESS-hybrids issues and options paper
We ran a webinar providing an overview of our proposals. This highlighted the key issues for feedback, along with questions and answers from participants. Watch the webinar
Related consultations
We encouraged interested parties to consider the following related consultation and discussion paper when providing feedback.
Common quality and wholesale market arrangements for BESSs and BESS-hybrid stations
We presented issues and options in this consultation related to:
- Part 8 common quality requirements for BESS-hybrid stations and idle BESSs
- Part 8 common quality requirements for voltage support obligations for transmission-connected generation, including potential to move the point of compliance to the network connection point
- Part 13 trading arrangements for BESS-hybrid stations
Based on feedback on these issues and options, we plan to consult on any Code amendments later in 2026.
5-minute settlement period discussion paper
We released a 5-minute settlement discussion paper on the costs and benefits of moving to a five-minute settlement period. The paper considered whether this change would better align settlement with the capabilities of fast‑responding technologies, such as BESSs. The Authority’s current view is that market conditions do not support a transition to a five‑minute settlement at this stage.
Submissions
-
Aquila9 pages
-
Contact8 pages
-
Datagrid2 pages
-
Electric Power Optimization Centre35 pages
-
ENA4 pages
-
ERGANZ12 pages
-
Genesis8 pages
-
Haast4 pages
-
Haast - Supplementary evidence2 pages
-
Mercury2 pages
-
Meridian3 pages
-
NewPower10 pages
-
Pacific Power Resources7 pages
-
Transpower92 pages
-
Unison and Centralines18 pages
-
Vector4 pages