General news

Assumption of rights and obligations of Pioneer Energy by Pulse Energy Alliance LP

  • Code

The Electricity Authority has approved Pulse Energy Alliance LP to assume the rights and obligations of Pioneer Energy Limited under Parts 8, 13, 14, and 14A of the Electricity Industry Participation Code 2010.

This approval takes effect from the first trading period on 7 August 2024.

Register of approved assumptions of rights and obligations

Related News

Consultation opens on permanent Code change to strengthen the System Operator’s info powers

The Electricity Authority is seeking feedback on a proposal to make permanent the urgent Code amendment that strengthens the System Operator’s ability to manag…

Decision on 21 December 2024 under-frequency event

Following consultation the Electricity Authority has decided that Transpower as the grid owner was the causer of the 21 December 2024 under-frequency event.

New member appointed to Common Quality Technical Group

The Electricity Authority has appointed Philip Wong Too (Technical Director Renewables at Mercury Energy) to its Common Quality Technical Group.