The Electricity Authority Te Mana Hiko's final determination is that Genesis Energy Limited, as the generator that owns Huntly Unit 4, was the causer of the 11 April 2024 under-frequency event (UFE).
The Authority's reasons for this final determination are:
- A UFE occurred at 12.25am on 11 April 2024 when frequency dropped to 49.17Hz in the North Island and 49.25Hz in the South Island
- The interruption/reduction of electricity occurred at the grid injection point for Huntly Unit 4, which belongs to Genesis
- No other asset was identified as having caused or potentially caused the UFE
- Genesis agreed with the system operator’s assessment that Genesis was the causer of the UFE
- The Authority did not receive any feedback that disputed its draft determination.
In accordance with clause 8.65 of the Electricity Industry Participant Code, the clearing manager will rebate the event charges to the relevant participants. The event charge calculated in the system operator’s report to the Authority is $205,003.75.
Any dispute of this final determination can be lodged with the Rulings Panel via registrar@electricityrulingspanel.nz by 5pm, 17 December 2024.
Related News
Stress test disclosures due by 24 June
The spot price risk disclosure regime requires certain participants in the wholesale electricity market to assess their financial exposure to hypothetical move…
Closure of section 16 review
The Electricity Authority Te Mana Hiko has closed an investigation into concerns raised with us about pricing, contract availability, and business conduct in t…
Eye on electricity: Battery performance in New Zealand
New Zealand is building more renewable electricity generation. However, renewable generation (like wind and solar) vary with the weather, so renewable electric…