Electricity Industry Participation Code (Transmission Pricing Methodology Related Amendments) Amendment 2026
Downloads
Related documents
-
Transmission pricing methodology amendments 2026 - Decision paper20 November 2026, 49 pages
-
Transmission pricing methodology amendments 2026 - Consultation paper29 June 2026, 71 pages
Explanatory note
This amendment to the Electricity Industry Participation Code 2010 (Code) comes into force on 1 April 2027.
The amendment amends the transmission pricing methodology (TPM) in Schedule 12.4 of the Code to:
(a) refine the simple method treatment of battery storage so that battery storage is not charged disproportionately compared to other supply technologies:
(b) remove the two-year lag between when an updated weighted average cost of capital applies to determine Transpower’s maximum allowable revenue, and when it applies to calculate benefit-based charges (BBCs):
(c) use the standard method (instead of the simple method) to allocate 50% of the capital cost of anticipatory connection capacity:
(d) enable the processing of BBC adjustments in one annual batch:
(e) remove the ‘substantial sustained increase’ adjustment event for BBCs:
(f) make minor amendments to the drafting of the TPM to improve clarity and remove redundant provisions.
Legislative information
| Title | Electricity Industry Participation Code (Transmission Pricing Methodology Related Amendments) Amendment 2026 |
|---|---|
| Principal or amendment | Amendment |
| Consolidated version | No |
| Empowering Act and provisions | Electricity Industry Act 2010, Section 38 |
| Replacement empowering Act and provisions | Not applicable |
| Maker name | Electricity Authority |
| Administering agency | Electricity Authority |
| Date made | 9 November 2026 |
| Publication date | 23 November 2026 |
| Notification date | Not applicable |
| Commencement date | 1 April 2027 |
| End date | Not applicable |
| Consolidation as at date | Not applicable |
| Related instruments | Electricity Industry Participation Code 2010 |