General news

Authority starts investigating self-reported breaches by Genesis Energy

  • Code
  • Compliance

The Electricity Authority Te Mana Hiko has started an investigation into self-reported breaches of the Electricity Industry Participation Code 2010 (Code) by Genesis Energy Limited.

Genesis Energy self-reported that it breached Part 13 clause 13.82(2) and Part 13 clause 13.82(3) of the Code on 26 January 2024.

This event relates to an alleged failure by Genesis Energy to comply with dispatch instructions at Huntly Unit 5 and failure to immediately advise the system operator of the circumstances for not complying with the dispatch instructions.

If any participant considers it is affected by the alleged breaches and wishes to join the investigation, it should contact the appointed investigator by 5pm on 27 March 2025.

The investigator can be contacted by:

  • email at compliance@ea.govt.nz with reference 2403GENE1 in the subject line
  • our Compliance portal
  • post at Compliance Investigator, Electricity Authority Te Mana Hiko, PO Box 10041, Wellington 6011.

View investigation notice

Related News

New members appointed to Switch and Data Formats Group

Following a recent call for nominations, the Electricity Authority is pleased to announce the three new members of the Switch and Data Formats Group.

Have your questions answered on new rules for connection pricing and application processes

We’re holding two online sessions next month about the upcoming new rules to improve connection pricing methodologies and the application processes for connect…

Code exemption granted to Meridian – Retail Market Monitoring Notice

The Electricity Authority has granted Meridian Energy Limited an exemption from certain data reporting requirements under the Retail Market Monitoring Notice.